3100 Morgan Road Bessemer, AL 35022 USA Ph: 1-800-247-9908 Fax: 205-425-4011
HOME
POLYMERS CERAMICS CONVEYORS WEARSPAN FLATBACK ELBOWS ENGINEERING SERVICES PRODUCT DEVELOPMENT

Hudco CMP Ceramic Rebuild

HUDCO CMP CERAMIC REBUILD is a cost effective alternative to replacing expensive worn equipment. It is a "non-slumping "paste designed to rebuild equipment badly worn or damaged by exposure to abrasive solids moving at high velocities. Since the major component is "diamondhard" silicon carbide, Ceramic Rebuild is NOT machinable

Although abrasion is blamed for most damaged to metals, other factors such as electrolysis, cavitation or chemical attack contribute significantly to their deterioration. Ceramic Rebuild's non-conductive, passivated surface offers an outstanding balance of protection against these additional factors. HUDCO'S Ceramic Rebuild costs only a fraction of other methods such as overlay welding, which often creates problems of warping, stress cracking and surface irregularities.

Equipment Examples Restored With HUDCO CMP CERAMIC REBUILD are:

  • Pump Components
  • Gate Valves
  • Pulverizer Mills
  • Tube Sheets
  • Pipe Elbows
  • Dust Collecting Equipment

Properties

  • Specific Gravity: 1.76
  • Mixing Ratio: Gray (R:H): 2:1 by Weight
  • Color: Grey
  • Pot Life: 30 - 40 Minutes at 75°F
  • Gel Time: 20 Minutes at 75°F
  • Initial Cure Time: 6 - 8 hours at 75°F
  • Final Cure Time: 24 Hours at 75°F
  • Maximum Operating Temperature: 250°F
  • Compressive Strength: 12,500 PSI
  • Lap Shear Strength: 4000 PSI
Packaging Coverage
2.2# Kit 3.57 Square Feet @ 1/16" Thick
4.4# Kit 7.13 Square Feet @ 1/16" Thick

Instructions

Surface Preparation: Roughen surface by grinding or sandblasting (3-5 mil profile). Surface must be completely dry with a minimum surface temperature of 75°F.

Mixing: Mix 2 parts of Resin to 1 Part of Hardener by weight. Kits are supplied in the correct ratio. Ensure that the sides of the mixing container are scraped into the mixture. Mix several minutes, until consistent color is achieved.

Application: Apply product to prepared surface and use supplied tools to achieve desired finish.

Curing: At 75°F, product will gel in 20 min. Initial cure will occur in 6 - 8 hours. Final Cure occurs in 1 Day. Curing can be accelerated by heating the applied product to 140°F. Product properties will also be improved by curing at this elevated temperature.


Safety Precautions:

Industrial use only. Keep away from children. Always use in well ventilated areas. Prolonged exposure to resin or hardener may cause sensitization and/or dermatitis. If eye contact occurs, irrigate promptly with clean water for 15 minutes and call physician. Wash with soap and water any areas of skin which come in contact with product. In the case of inhalation, remove to fresh air and provide oxygen if necessary. If ingestion should occur, call a physician at once.


Storage:

This product has a shelf life of 1 year and must be stored at a temperature between 70°F and 85°F.


Warranty:

Because the storage, handling and application of these materials are beyond our control, we can accept no liability for the results of their use. Our liability is limitied only to replacement of any material proven defective in manufacture.

Download Application Instructions Here

Click Here to Return to Polymers Page
© 2005 Hudco Industrial Products, Inc. All rights reserved. 3100 Morgan Road Bessemer, AL 35022 USA •   Ph: 1-800-247-9908 •   Fax: 205-425-4011